Scilab Website | Contribute with GitLab | Mailing list archives | ATOMS toolboxes
Scilab Online Help
6.0.2 - Português

Change language to:
English - Français - 日本語 - Русский

Please note that the recommended version of Scilab is 2025.0.0. This page might be outdated.
See the recommended documentation of this function

Ajuda do Scilab >> Otimização e Simulação > Optimization base > optimbase_proj2bnds

optimbase_proj2bnds

Returns a projection point.

Syntax

[opt, p] = optimbase_proj2bnds(opt, x)

Argument

opt

The object of TOPTIM type (tlist).

x

A vector of doubles, the current point.

p

A vector of doubles, the projected point.

Description

The optimbase_proj2bnds function returns a point, which is the projection of the given point into the bounds.

Example

opt = optimbase_new ();
opt = optimbase_configure(opt,"-numberofvariables",2);
opt = optimbase_configure(opt,"-verbose",1);
opt = optimbase_configure ( opt , "-boundsmin" , [-5.0 -5.0] );
opt = optimbase_configure ( opt , "-boundsmax" , [5.0 5.0] );
[ opt , p ] = optimbase_proj2bnds ( opt ,  [0.0 0.0] );
disp(p)

[ opt , p ] = optimbase_proj2bnds ( opt ,  [-6.0 6.0] );
disp(p)

opt = optimbase_destroy(opt);

See also

Report an issue
<< overview Optimization base optimbase_set >>

Copyright (c) 2022-2024 (Dassault Systèmes)
Copyright (c) 2017-2022 (ESI Group)
Copyright (c) 2011-2017 (Scilab Enterprises)
Copyright (c) 1989-2012 (INRIA)
Copyright (c) 1989-2007 (ENPC)
with contributors
Last updated:
Thu Feb 14 15:00:45 CET 2019