Scilab 5.5.0
- Scilabヘルプ
- Optimization and Simulation
- Optimization base
- optimbase_cget
- optimbase_checkbounds
- optimbase_checkcostfun
- optimbase_checkx0
- optimbase_configure
- optimbase_destroy
- optimbase_function
- optimbase_get
- optimbase_hasbounds
- optimbase_hasconstraints
- optimbase_hasnlcons
- optimbase_histget
- optimbase_histset
- optimbase_incriter
- optimbase_isfeasible
- optimbase_isinbounds
- optimbase_isinnonlincons
- optimbase_log
- optimbase_new
- optimbase_outputcmd
- optimbase_outstruct
- overview
- optimbase_proj2bnds
- optimbase_set
- optimbase_stoplog
- optimbase_terminate
Please note that the recommended version of Scilab is 2025.0.0. This page might be outdated.
See the recommended documentation of this function
optimbase_proj2bnds
Returns a projection point.
Calling Sequence
[opt, p] = optimbase_proj2bnds(opt, x)
Argument
- opt
The object of TOPTIM type (tlist).
- x
A vector of doubles, the current point.
- p
A vector of doubles, the projected point.
Description
The optimbase_proj2bnds
function returns a point, which is the
projection of the given point into the bounds.
Example
opt = optimbase_new (); opt = optimbase_configure(opt,"-numberofvariables",2); opt = optimbase_configure(opt,"-verbose",1); opt = optimbase_configure ( opt , "-boundsmin" , [-5.0 -5.0] ); opt = optimbase_configure ( opt , "-boundsmax" , [5.0 5.0] ); [ opt , p ] = optimbase_proj2bnds ( opt , [0.0 0.0] ); disp(p) [ opt , p ] = optimbase_proj2bnds ( opt , [-6.0 6.0] ); disp(p) opt = optimbase_destroy(opt);
See Also
- optimbase_checkx0 — Checks initial guess.
- optimbase_checkbounds — Checks the bounds.
- optimbase_hasbounds — Checks if the bounds are specified.
Report an issue | ||
<< overview | Optimization base | optimbase_set >> |