optimbase_proj2bnds
Returns a projection point.
Syntax
[opt, p] = optimbase_proj2bnds(opt, x)
Argument
- opt
The object of TOPTIM type (tlist).
- x
A vector of doubles, the current point.
- p
A vector of doubles, the projected point.
Description
The optimbase_proj2bnds
function returns a point, which is the
projection of the given point into the bounds.
Example
opt = optimbase_new (); opt = optimbase_configure(opt,"-numberofvariables",2); opt = optimbase_configure(opt,"-verbose",1); opt = optimbase_configure ( opt , "-boundsmin" , [-5.0 -5.0] ); opt = optimbase_configure ( opt , "-boundsmax" , [5.0 5.0] ); [ opt , p ] = optimbase_proj2bnds ( opt , [0.0 0.0] ); disp(p) [ opt , p ] = optimbase_proj2bnds ( opt , [-6.0 6.0] ); disp(p) opt = optimbase_destroy(opt);
See also
- optimbase_checkx0 — Checks initial guess.
- optimbase_checkbounds — Checks the bounds.
- optimbase_hasbounds — Checks if the bounds are specified.
Report an issue | ||
<< overview | Optimization base | optimbase_set >> |